On Wednesday april 8 2020, our new flagship KP8 was delivered by Merwelands Jachtbouw after a 3-month renovation. In addition to a complete paint job, a new push bow was set up and the stern was equipped with Polymarine. The roof has been adapted to our wishes and coupling winches have been installed. Everywhere on deck is now LED lighting and in the wheelhouse all equipment has been replaced so that everything is up to current standards The engines have also had maintenance and the propeller shafts have been adjusted. The necessary adjustments have also been made in the engine room so that the ship is now ADN certified. All in all a major renovation and we are proud of our new addition. We wish her a safe journey.
On Wednesday april 8 2020, our new flagship KP8 was delivered by Merwelands Jachtbouw after a 3-month renovation. In addition to a complete paint job, a new push bow was set up and the stern was equipped with Polymarine. The roof has been adapted to our wishes and coupling winches have been installed. Everywhere on deck is now LED lighting and in the wheelhouse all equipment has been replaced so that everything is up to current standards The engines have also had maintenance and the propeller shafts have been adjusted. The necessary adjustments have also been made in the engine room so that the ship is now ADN certified. All in all a major renovation and we are proud of our new addition. We wish her a safe journey.